This was one of those projects where there was evidence that that company had done really well on the project. I was the sole design drafter that created the 3-D model and detail drawings. The challenges we faced were computer systems that were quite slow in process that data, but the end result was positive for all stakeholders.
No. 3 Basic oxygen Furnace - Rebuild
Achievements significantly exceeded budgeted time frame for delivery.
For more information on BlueScope Steel

